IE工作职责
  IE
               
  IE
IE
                 
IE   ,使 使  
.  IE
  。其 ,
.
.  IE
1. :其  
2.     , , ,
(A)  
(B)     ( Standard Time )   Standard Time 产平
3. IE
使
IE  =    50 %  +  50 %
        IE -----
  MODEL
A. 如何删除ie 
1. DE  :爆 PKI. BOM
                                            PA.GA. PR DE 作;
2 . DE         MP IE 制作T/UCasing Sample;
      SAMPLE                       Packing Sample DE Confirm   PROD
   
B.  JIG 准备 :按 PR Sample Workshop .
C.  准备:
a. General Flow Chart ( )
b. Standard Time ( )                                                                         
                                                                                                            Bonding                 
c. Location Flow Chat  ( )                                                  SMT             
                                                                                                          VCD     
d. Procedure  ( )                                  Insertion
                                                                                      Wave-soldering
e. Manufacturing Cost  ( )                          PCB Touch-up &                                                                     
                                                                                      assembly
                                                                                                            PCB Test
Bill of  indirect Material (辅料表)                                                    Casing
                                                                                                            Casing test
                                                                                                            Packing
                                                                                                            Jig & De-panel & 
                                                                                                            Heat-seal
D.  : MODEL ( PA. GA .PR , IE  FOLLOW REPORT )
MP Mode l ( )
A. Flow Chart , Location Flow Chart Procedure.
B.
a.
b. (Heat Seal Machine )
拉上工具的管理维护:如烙铁、电批等,包括领取发放,回收、更换
                                          调校等。
c.          
                        Prod 出问                          
                                       
                        IE        
                                                                                 
                                                                                 
             
                                                                                                     

版权声明:本站内容均来自互联网,仅供演示用,请勿用于商业和其他非法用途。如果侵犯了您的权益请与我们联系QQ:729038198,我们将在24小时内删除。