山区城市道路设计方案比选要点分析与应用
山区城市道路设计方案比选要点分析与应用
Key Points Analysis and Application of Scheme Selection o f Urban Road in
_____________市政•交通•水利工程设计
M u m e ta l -T raffic' Water Resources Engineering Design
Mountainous Areas
增大压强的方法苏贤锋
(湖南中大设计院有限公司,长沙410075)
动漫产业的发展前景SU  Xian-feng
(Hunan Zhongda Design Institute Co. Ltd., Changsha 410075, China)
【摘要】山区中小城市规划的在落实过程中难度较大,道路设计方案往往需要对规划修编提出较好的建议。论文基于具体工程实 例,详细叙述了在房屋密集区、临河区域以及穿越构造物时,山区城市道路设计方案的比选思路,以期为设计人员在此类道路的设计 中提供重要参考,也为规划修编提供现实依据。
【Abstract 】Small and medium-sized urban planning in mountainous areas has poor practicability, and the road plan design should provide  better suggestions for planning revision. Based on specific engineering examples, this paper describes in detail the comparison and selection o f  urban road design schemes in mountainous areas when housing clusters, riverside areas and crossing structures. It is expected to provide  important reference for designers in the design o f s uch roads and provide practical basis for planning and revision.
【关键词】山区城市道路;方案比选;道路网规划
【Keywords 】urban roads in mountainous areas; scheme comparison and selection; road network planning
【中图分类号】U 412.32 【文献标志码】B  【文章编号】1007-9467 (2019) 09-0097-03
【DOI 】10.13616/j ki .gcjsysj .2019.09.033
1引言
中小城市因其自身的规模、性质、功能以及所处的地位不
同,道路网系统规划与建设在整体道路网规划中长期被忽
小学学校教学工作总结
视山区城市又由于受地形高差的限制以及小城镇规划深
度的局限,在规划层面研究的道路线位可实施性差,受地形限
服饰搭配制大,在方案设计阶段需对道路线路进行优化调整,以保证规
划的可实施性以及工程方案的经济、合理。
浴室推拉门本文以一具体工程为例,详述在道路选线设计过程中的选
线经济比较以及道路断面选择中需综合考虑的因素和条件,从
而对规划提出建议,为工程实施以及相关技术人员设计提供【作者简介】苏贤锋0 987 ~ ),男,湖南武闪人,工程师,从事道路桥梁
册与研究。案例参考。2项目概况沙堤大道为张家界市沙堤片区一条城市主干路,设计速 度50km/h ,道路全长9.5km ,道路原规划路幅宽36m ,坜青混 凝土路面。道路线位有多段与老路X 018县道重合,老路为四 级公路,路基宽7~9m ,沥青混凝土路面现状道路线形基本 顺应地形而走,线形较差。老路两侧民房较多,可利用的条 件较差。3方案要点分析
由于方案设计时此片区规划尚未完善,方案设计内容将
为规戈_整提供依据。通过对沙堤片区的分析,片区为山间谷
宽带 提速
地,沙堤大道和武陵山大道共同组成片区(高铁新区)的南北 纵向的骨干路网,均南接张家界中心城区,北联武陸源景区,97

版权声明:本站内容均来自互联网,仅供演示用,请勿用于商业和其他非法用途。如果侵犯了您的权益请与我们联系QQ:729038198,我们将在24小时内删除。